Alva GH312 Manuel - Sayfa 10
Gazlı Isıtıcı Alva GH312 için çevrimiçi göz atın veya pdf Manuel indirin. Alva GH312 17 sayfaları. Luxurious infrared radiant with three ceramic panels ans variable heat controls
Ayrıca Alva GH312 için: Eğitim Kılavuzu (9 sayfalar)
ASSEMBLY INSTRUCTIONS
1.
To assemble the base with pre-assembled castors in place,
turn the heater over, placing the top panel on a piece of
cardboard or cloth. Place the base onto the heater body,
lining up the punched holes.
Fig.G
Fig.I
2.Put M4 nut, M4 screw, Ø 4
washer, Ø spring washer into the
corresponding holes (Fig.G) and
(Fig.H).
Do not secure them in this step.
M4 Screw
M4 Nut
Ø4 Spring washer
Ø4 Washer
Fig.H
3.Fasten ST3.5x10 self tapping
screws on the corresponding
holes (Fig I).
Check if the connection is correct
and then fasten the screws in
Step 2.
8
M4 Nut
M4 Screw
Ø4 Washer
Ø4 Spring washer
ST3.5x10 self tapping
screws