Alvarado Supervisor 500 Kurulum Talimatları Kılavuzu - Sayfa 18

Turnikeler Alvarado Supervisor 500 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Alvarado Supervisor 500 19 sayfaları. Barrier-free optical counting turnstile

Alvarado Supervisor 500 Kurulum Talimatları Kılavuzu

Appendix A - Multi-Lane Conduit Requirements

Two-Lane Configuration
LANE 2
Slave
Cabinet
Three-Lane Configuration
LANE 3
Slave
Center
Cabinet
Cabinet
Symbology
Page 34
For Assistance: [email protected] +1 (909) 591-8431
SU500 Installation Instructions
LANE 1
Center
Master
Cabinet
Cabinet
LANE 2
LANE 1
Center
Cabinet
Description
Conduit Size
Primary
3/4"
Power
Ethernet
3/4"
Cable
Crossover
1.5"
Cable
SU500 Installation Instructions

Revision History

Revision
Date
5-0
07/14/15
Master
Cabinet
PUD1456R5-0
PUD1R5-0
Author
Description
A. Flores
Updated to new optical electronics configuration.
For Assistance: [email protected] +1 (909) 591-8431
Page 35