Et ET1000 Montajcı Talimatları - Sayfa 6

Kapı Açıcı Et ET1000 için çevrimiçi göz atın veya pdf Montajcı Talimatları indirin. Et ET1000 13 sayfaları. Sliding gate operator commercial/industrial 1000kg mass

2.2 Installation and adjustment.

2.2.2 Installing the rack. (Ensure the rack tracks straight and true across the pinion gear. Where
necessary make use of feathering spacers between the rack and gate fascia to compensate for
bowed gates).
View of rack tracking across
pinion. Ensure the teeth of both
the rack and pinion are parallel
to avoid binding.
Position the base plate
between 30 and 45mm away
from the fascia of the gate.
NB! Take care when
determining the entry point for
your cabling.
1 to 2mm spacing
6