ET2 E42014-90 Hızlı Başlangıç Kılavuzu - Sayfa 4
İç Mekan Mobilyaları ET2 E42014-90 için çevrimiçi göz atın veya pdf Hızlı Başlangıç Kılavuzu indirin. ET2 E42014-90 4 sayfaları. Led mirror
IMPORTANT:
-Turn off the power at the main fuse or circuit breaker box before starting installation
-This mirror can be mounted over an electrical outlet box or on the wall and
plugged into an outlet
-Carefully remove all parts from the box, and place on a flat surface. Throughout
the assembly, be careful to avoid scratching the surface of the mirror.
Step 1
WALL TEMPLATE
Cleaning & Care:
Clean glass with household glass cleanser.
Step 2 - Step 4
MARK
B
4PCS
A
4PCS
Step 4
C
Step 5
1.) Place the wall template or the
mirror on the wall in the location
selected for the mirror. Make sure the
wall template or mirror is level and in
the correct position. Secure the wall
template to the wall then mark location
of the 4 wall anchors(A) as indicated
on the template from the wall.
Remove the wall template from the
wall.
2.) Create holes on wall marks and
screw the (X4) wall anchors (A).
3.) Secure (X4) nails (B) into (X4) wall
anchors (A).
4.) Hang (X4) wall hangers (C) on the
back of mirror onto (X4) nails (B). If
wall is not mounted parallel to floor,
repeat step 4.
5.) Plug cord into closest power outlet.
OR before step 5, cut the plug and
connect the wire with junction box
wire.
*IMPORTANT SAFETY INSTRUCTIONS
This mirror has a 3 pins plug, once the
plug is cut, the 3 core
wire(phase/neutral/ground) will be
exposed then can connect with
phase/neutral/ground which come out
from junction box
MADE IN CHINA
Page 4 of (4)