Clinton 243 Montaj Talimatları - Sayfa 2
İç Mekan Mobilyaları Clinton 243 için çevrimiçi göz atın veya pdf Montaj Talimatları indirin. Clinton 243 4 sayfaları. Folding mat platform
ASSEMBLY INSTRUCTIONS FOR FOLDING MAT PLATFORM
Thank you for counting on Clinton to meet your medical
equipment needs by purchasing this fine equipment.
All Clinton equipment is designed and manufactured to
provide years of dependable service because we want you
as a customer now and in the future. Below are easy to follow
instructions on how to properly assemble your equipment.
Please contact us at 800-441-9131 if you experience any
difficulty with the assembly or have questions.
Contents
Hardware
A. Chain Board
(2) 2
B. Back Board
(2) Locknuts
C. Mat Platform
(4)
(2) 2
(1) 2" Hex Head Bolt
(12) Washers
(1) Acorn Nut
(4) Black Star Knobs
(1) Tension Knob
Tools Required
Time Required
• Phillips Screwdriver
• 20–25 Minutes
MAXIMUM WEIGHT CAPACITY 500 LBS
A
C
B
/
" Phillips Head Bolts
1
2
/
" Phillips Head Machine Screws
3
4
/
" Hex Head Bolts
1
4
MODEL 243
Place the Back Wall into preferred location and
1
have professionally installed using appropriate
hardware in accordance with wall type. Lower
legs on Platform and lock into down position in preparation
for the next step. Note- the Back Wall must sit on the floor
and be flush against the wall.
Make sure chain is connected between the
2
Chain Board and the Mat Platform. Place the
Platform in the stored position and place Chain
Board on the wall at a height where the chain is tight. This
will be the appropriate height for the Chain Board to be
professionally installed. Use appropriate hardware
in accordance with wall type.