clivus multrum CM40 Kullanım Kılavuzu - Sayfa 6

Tuvaletler clivus multrum CM40 için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. clivus multrum CM40 20 sayfaları. Waterless composting toilet systems
Ayrıca clivus multrum CM40 için: Kurulum Kılavuzu (18 sayfalar), Kurulum Kılavuzu (18 sayfalar), Kurulum Kılavuzu (19 sayfalar)

TOOLS REQUIRED

Screwdriver
(Philips/plain)
Scissors/Knife
Jigsaw

MATERIALS REQUIRED

Water to wet starter material.
Additional 50mm PVC pipe (coupling and bends if absorption trench is to be
located some distance away from tank). Additional pipe bends if needed for vent
pipe.
In poor soil conditions, extra length of trenching arch or agi drain may be required.
Drainage gravel for excess fluids drain.

INSTALLATION SUMMARY

1. Ensure the tank is in a position so that the toilet chute will be perfectly straight over
the tank below.
2. Ensure the tank foundation is solid with a concrete, sand or crusher dust bed.
3. Mark and cut holes in the floor for the toilet chute.
4. Mark and cut holes in the tank top.
5. Insert toilet chute and pedestal.
6. Install the vent system.
7. Install the liquid end-product drain pipe and absorption/transpiration trench.
8. Connect fan to power source.
9. Check everything is sealed.
10. Place a starter-bed of suitable bulking agent (e.g. wood shavings) in the unit.
11. Wet bulking agent before use of toilet.
12. Add starter bacteria after 14 days of use.
IMCM-40-2023-12-04
Spade
Drill
Tape Measure
ecoflo.com.au
1300-138-182
Spirit Level
Caulking gun
PPE
Marker
Ladder
4