Doherty PLE02 Kullanıcı Talimatları - Sayfa 17
Tıbbi Ekipman Doherty PLE02 için çevrimiçi göz atın veya pdf Kullanıcı Talimatları indirin. Doherty PLE02 20 sayfaları. 2 & 3 section plinths
Prior to any general maintenance always disconnect the plinth from the mains supply.
Sidhil recommends that every six months the following maintenance procedures
should be carried out to help prolong the life of the plinth:
•
Ensure that all fixings including nuts and bolts are tight and that none are missing
or incomplete.
•
Check that all cabling is in good condition and that wear or abrasion has not
caused any excessive bending, kinking or damage.
•
Check that the mains cable plug is not damaged. Should damage or deterioration
occur to the mains cable or plug, they must be replaced by authorised Doherty
service or repair personnel or approved service agents only.
WARNING!
15
9. MAINTENANCE