Clopay EZ-SET Montaj/Kurulum Talimatları - Sayfa 4

Garaj Kapısı Açıcı Clopay EZ-SET için çevrimiçi göz atın veya pdf Montaj/Kurulum Talimatları indirin. Clopay EZ-SET 12 sayfaları. Torsion spring system

Clopay EZ-SET Montaj/Kurulum Talimatları
NOTE: Refer to standard instruction manual to
determine the radius of your track.
Step 2
Push the two torsion tube sections firmly into the
coupler.
NOTE: There are sets of two opposing holes
in each end of the coupler. When attaching the
coupler to each tube be sure to use the two
holes that are on the same side of the coupler
as shown in figure 4.
After the tubes are inserted completely into the
coupler, drill one
/
" pilot hole in each torsion
3
16
tube using the coupler holes as a guide. Fasten
the coupler to the tube with () #14 x
metal screws. (FIg. 4) Make sure the screws are
secure. be careful not to over tighten screws, as
this could cause the hole to be stripped out.
ImPORTANT!
Step 3
Lay the spring(s) flat on the floor. Measure the
length of each spring as shown in Figure 5, and
record each length in the space provided. You will
need to refer to this length in Step 7.
4
fig. 4
/
" sheet
5
8
fig. 5
#14 x
/
" Sheet
5
8
metal Screw
Tube
Coupler
Torsion
Tubes
TUBE COUPlER (If SUPPlIEd)
left Spring
End of
Spring
Spring Plug
Right Spring
Spring Plug
End of
Spring
fig. 5A

dETAIl VIEW

(RECORD LENGTH HERE)
Left Side Spring Length
L-GREEN
(RECORD LENGTH HERE)
Right Side Spring Length
End of
Spring
Set Cone
End of
Spring