Ashford e-Spinner 3 Talimatlar Kılavuzu - Sayfa 2
Dönen Tekerlekler Ashford e-Spinner 3 için çevrimiçi göz atın veya pdf Talimatlar Kılavuzu indirin. Ashford e-Spinner 3 6 sayfaları.
Ayrıca Ashford e-Spinner 3 için: Montaj Kılavuzu (6 sayfalar)
ASSEMBLY INSTRUCTIONS FOR
THE ASHFORD e-Spinner 3
Tools Required
Before commencing, please read these instructions
completely, identify the parts and note the assembly
sequence.
Finish
Your e-Spinner 3 has been lacquered prior to
assembly. If desired Ashford Finishing Wax Polish may
be applied to further enhance its appearance.
(small hammer)
Assembly
1. Squeeze and slide the stainless-steel yarn guides
onto the flyer arms.
Note the nylon eyes are on the same side.
NOTE: when spinning at higher RPM it may be
necessary to squeeze and rotate whichever yarn
guide isn't being used to achieve perfect balance.
2. Cut the nylon brake band into 2 pieces, 35cm (14")
for the brake band and 65cm (25½") for the lazy
kate. Tie the 35cm (14") piece to one of the springs
attached to a screw eye. Then tie the spring to the
brake band allowing approx. 27cm – 28cm (10½ – 11")
between the springs. See illustration. Thread the
tail of the nylon brake band down the inside of the
spring and trim off surplus.
27cm – 28cm (10½" – 11")
Screw eye
3. Rub candle wax onto the end of the
screw eye. Thread the screw eye with the
tension spring and brake band attached,
into the pilot hole in the left-hand side.
4. Rub candle wax onto the end of the
screw eye. Thread the screw eye into the
pilot hole in the right-hand side.
2