d&b audiotechnik Z5399 Montaj Talimatları - Sayfa 7
Raflar ve Standlar d&b audiotechnik Z5399 için çevrimiçi göz atın veya pdf Montaj Talimatları indirin. d&b audiotechnik Z5399 9 sayfaları.
Ayrıca d&b audiotechnik Z5399 için: Montaj Talimatları (8 sayfalar)
2. Declarations
d&b Z5399 Mounting instructions 1.1 en
2.1. Manufacturer's declaration
This declaration covers:
–
d&b Z5399, VP Mounting bracket.
National standards and technical specifications
applied:
DIN 18 800, DIN 1055, DGUV Vorschrift 17.
Backnang, 2014-06-24
Frank Bothe,
Head of R&D
d&b audiotechnik GmbH
2.2. Disposal
When out of use the rigging components must be disposed of in
accordance with the national environmental regulations.
Ensure that damaged rigging components are disposed of in a
way that they cannot be used again.
7