American Standart Flash R950 Інструкція з монтажу - Сторінка 2

Переглянути онлайн або завантажити pdf Інструкція з монтажу для Блок управління American Standart Flash R950. American Standart Flash R950 5 сторінок. Rough valve kit

1
INSTALL TUB FILLER FLOOR SUPPORT
• Note: Refer to Roughing-in Dimensions on page 1 for additional information.
• Adequate floor support is required. The WOOD SUPPORT (1) must be a minimum of 2" (51 mm) thick by 10" (254 mm) wide.
2x6 lumber is NOT adequate for this application.
• Locate WOOD SUPPORT (1) between floor joists keeping a minimum distance of 2-3/4" (70 mm) from the top surface of
wood support to the finished floor.
• IMPORTANT: Use a ROUND BUBBLE LEVEL (2) to level the WOOD SUPPORT (1). The WOOD SUPPORT (1) must
be perfectly level. Secure WOOD SUPPORT (1) to floor joists. Check for level again.
FINISHED FLOOR LINE
I N .
) M
m m
( 7 0
/ 4 "
2 - 3
2
INSTALL HOT AND COLD WATER SUPPLIES
• Sweat together Hot and Cold Supply assemblies. Apply sealing tape to threaded connections. Thread supply assemblies
into rough-in valve inlets. The Hot inlet will be on the left when facing the front of the Tub Filler.
Note: The Hot and Cold inlets are marked on the maniflod. See View "A".
HOT
FRONT
View "A"
)
m m
3 0 5
5 4 -
" ( 2
- 1 2
1 0 "
1 0 "
( 2 5 4
m m )
M I N
.
COLD
Turn off hot and cold water
CAUTION
supplies before beginning.
1
WOOD SUPPORT
2
ROUND BUBBLE LEVEL
FLOOR JOIST
HOT
F R O
N T
- 2 -
SEALING
TAPE
SUPPLY
COLD
ASSEMBLY
M965925 (5/18)