American Telecom SL PTG012 Інструкція з монтажу - Сторінка 2
Переглянути онлайн або завантажити pdf Інструкція з монтажу для Зарядний пристрій American Telecom SL PTG012. American Telecom SL PTG012 5 сторінок. Telephone and charging station
Charger Installation
The SL PTG012 SpectraLink Phone and Charging station is shipped with its power
supply and charger regulator boards installed, and with their distribution jacks routed and
configured, as illustrated here:
At the front of the unit:
1. Lift open the front door of the enclosure.
2. Locate the pre-drilled hole-pairs, and identify the pairs that will be used to mount
the individual battery chargers (refer to the photo at the top of this page).
Charger
Power
Supply
Jacks
SL PTG012 Installation Instructions
AMERI*CAN TELECOM INC.
Technical Document
SL PTG012, Rear View
Door
Charger Mounting Hole-pairs
Page 2