When Planning for the installation of the fire-
place, the framing height must be increased
from 46-1/2" to 47-1/4", when installing the
drain pan. An additional space below the
fireplace will also be required to plumb a
drain line.
Step 1. Seal all joints, gaps and corners around
the bottom of the drain pan before positioning
the fireplace on its location (Figure 3).
Step 2. On the exposed drain hole, install a PVC
threaded coupling reducer, 3/4" x 1/2" going
from the top of the pan down through the hole.
Apply a silicone-based sealant around the base
and threads before installation.
Step 3. Holding the reducer coupling with a
wrench, thread a 3/4", 90 degree, PVC elbow to
the reducer until it is tight to the metal.
Step 4. Add additional piping to route the drain
to an appropriate location.
NOTE: To assure proper drainage, the fireplace
must be installed on a leveled surface.
CLEARANCES
Minimum clearance to combustibles for the
fireplace is as follows; sides and back – 1/2"
(13mm), combustible floor – 0" (0mm), adja-
cent wall 6" (152mm), ceiling – 50" (1270mm).
Refer to Figure 4 on this page and Figure 18
on Page 13 for more detail.
NOTE: Clearance behind the nailing flange for
both fireplace models is 1/2" (13mm).
NOTE: Adjacent wall considerations are for an
adjacent wall to only a single side. Walls should
not be placed at the minimum distance on both
sides of the fireplace. Allow at least 4 feet on
one side of the fireplace.
Figure 3
Combustable Materials
Allowed Flush With
1/2" Airspace Clearance
To Sides And Back
No Material Within
The Face Opening
Noncombustables
May Overlap The Face
TOP VIEW
Figure 4
NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.
Threaded
Reducer
3/4 x 1/2
(PVC)
Drain Connector Detail
47 1/4
The Face Front
Noncombustable
Material Only
5"
Only
Noncombustable
Material May
Overlap The
Top Face
Do NOT Overlap
Material Within
The Face Opening
No Material
Allowed in
This Area
Combustible Material
May Overlap The
Face Bottom Up To 2"
Below The Face Opening
Threaded
Elbow 3/4
º
@ 90
(PVC)
1/2" Airspace Clearance
To Sides And Back
1/2" Clearance
Nailing Flange May
Make Direct Contact
With Combustible
Framing
No Combustables
Below The Top Spacers
1/2"
Airspace
Clearance
To Back
SIDE VIEW