STEP 6
Center the bow canopy at this time before securing the hold-down arm (4) to the pontoon. Place end of hold-down arm (4) into bracket (B).
STEP 7
Move to the installation of the extended aft frame/canopy (Figure 4).
FIG. 4
PORT LEG
EXTENDED AFT CANOPY & EXT. AFT CANOPY FRAME ASSEMBLY (FIGURE 4)
STEP 1
Insert crown piece (1) into the port leg (2) and starboard leg (3) making sure that the bend in the center of the crown is to the top following
the curve of the frame.
STEP 2
At this time, you can fix the frame at the split location by using the #8 self drilling screw provided.
STEP 3
With two people, the frame can now be attached to the boat and deployed.
STEP 4
Once the frame is up the extended aft canopy can be installed on the frame.
1. Zip the pocket onto the bow first
2. Pull the extended aft canopy zippers to the aft canopy zippers and zip together
3. Center the extended aft canopy
4. Engage the pusher arms
CURTAINS (FIGURE 5)
STEP 1
Each curtain has a tag sewn in the upper left-hand corner of the flap. This will identify each curtain and give its location on the pontoon.
STEP 2
The curtain flaps will face the inside of the pontoon.
STEP 3
Zip all curtains to both canopy tops.
Dowco Marine, Inc. | 1610 Frisco Drive, Lebanon MO 65536 | dowcomarine.com | (800) 404-5252
2
1
CROWN PIECE
3
STARBOARD LEG
140133-00 | 02/19