AirStage ASUB36TLAV1 Посібник з монтажу - Сторінка 15
Переглянути онлайн або завантажити pdf Посібник з монтажу для Кондиціонер AirStage ASUB36TLAV1. AirStage ASUB36TLAV1 16 сторінок.
8.2. Front panel removal
4/7/9 model
(1) Remove wire cover and remove 3
screws.
NOTES:
When replacing the front panel, do not
scratch or damage the louver.
(2) The front panel is pulled to the front,
raising the upper surface, then the front
panel is removed.
30/36 model
Screws (Wire cover)
(1) Remove 4 caps, remove
wire cover and remove
10 screws.
NOTES:
When replacing the front
panel, do not scratch or dam-
age the louver.
(2) The front panel is pulled
to the front, raising the
upper surface, then the
front panel is removed.
8.3. Front panel installation
4/7/9 model
(1) Firstly, fit the lower part of the front panel, and insert top and bottom hooks. ( 3 top
sides, 6 bottom sides)
Top holes
Indoor unit
Bottom holes
(2) Three screws is attached.
(3) The wire cover is attached.
30/36 model
(1) First, fit the lower part of the front panel, and insert top and middle hooks. (3 top
sides, 5 middles)
Top holes (3 position)
Middle hooks
Indoor unit
(5 position)
(2) Attach the 10 screws.
(3) Attach the wire cover.
(4) Attach the 4 caps.
Screws (Wire cover)
Wire cover
Screws (3 position)
Wire cover
Screws
(10 position)
Caps (4 position)
Front panel
Top hooks
Front panel
Bottom hooks
Top hooks
(3 position)
Front panel
Middle hooks
(5 position)
9. TEST RUN
9.1. Test run using Outdoor unit (PCB)
Refer to the Installation Manual for the outdoor unit if the PCB for the outdoor unit is to be
used for the test run.
9.2. Test run using remote controller
• Refer to the Installation Manual for the remote controller to perform the test run using the
remote controller.
• When the air conditioner is being test run, the OPERATION and TIMER indicator lamp
flash slowly at the same time.
10. CHECK LIST
Pay special attention to the check items below when installing the indoor unit(s). After
installation is complete, be sure to check the following check items again.
Check items
Has the indoor unit been installed
correctly?
Has there been a check for gas leaks
(refrigerant pipes)?
Has heat insulation work been
completed?
Does water drain easily from the
indoor units?
Is the voltage of the power source the
same as that indicated on the label on
the indoor unit?
Are the wires and pipes all connected
completely?
Is the indoor unit earthed (grounded)?
Is the connection cable the specified
thickness?
Are the inlets and outlets free of any
obstacles?
Does start and stop air conditioner
operation by remote controller or
external device?
After installation is completed, has the
proper operation and handling been
explained to the user?
If not performed correctly
Vibration, noise, indoor unit may drop
No cooling, No heating
Water leakage
Water leakage
No operation, heat or burn damage
No operation, heat or burn damage
Short circuit
No operation, heat or burn damage
No cooling, No heating
No operation
Check
box
En-14