Atlas Copco ETD M120ABL V2 Інструкція до продукту - Сторінка 5

Переглянути онлайн або завантажити pdf Інструкція до продукту для Викрутка-шуруповерт Atlas Copco ETD M120ABL V2. Atlas Copco ETD M120ABL V2 16 сторінок.

ETD M120ABL V2
Storage temperature (min to max)

Service overview

Service recommendations

Preventive maintenance is recommended at regular intervals. See the detailed information on preventive
maintenance. If the product is not working properly, take it out of service and inspect it.
If no detailed information about preventive maintenance is included, follow these general guidelines:
Clean appropriate parts accurately
Replace any defective or worn parts

Microtorque Front Part Test

The Microtorque Front Part validation test is performed in two separated parts, one for bit run out and one
for bit grounding. Validation of both bit wobbling and bit grounding is part of the tool verification plan.
Bit wobbling test
To perform the test, place the tool in the rig and securely fastened with the spanner. Connect the tool to
the controller and run at no load. The rotation speed is set to 200±10 rpm.
EN
© Atlas Copco Industrial Technique AB - 9836 7911 01
-25ºC to 60ºC (-13ºF to 140ºF)
Product information
5