DAIREN SSW 24-4ND Посібник з експлуатації - Сторінка 10
Переглянути онлайн або завантажити pdf Посібник з експлуатації для ДБЖ DAIREN SSW 24-4ND. DAIREN SSW 24-4ND 11 сторінок. 24v ups
9) Battery Installation and Wiring
9.1 Ensure the
and the
MAINTENANCE SWITCH
position .
9.2
The positive and negative wires of the battery are installed on the
BATT+ and BATT- of the PCB card respectively.
9.3 Connect the battery cables one by one and confirm the positive and
negative polarity of the battery.
9.4 Arrange the battery cable and push the battery into the cabinet
battery compartment.(Figure 2)
9.5 Battery installation and wiring completed.
Note: Before turning on OUTPUT MCB, must ensure the AC load is not short
circuited or overloaded (more than 120W)
Figure 1
Revision: 01
Operation Manual of 24V UPS
INPUT MCB
and
OUTPUT MCB
on the PCB card must be at off
Figure 1)
(
Date: Dec.5. 2021
on the UPS door panel
Figure 2
Page
of
10
10