Anzzi L-AZ901MB-BG Посібник з монтажу та експлуатації - Сторінка 5

Переглянути онлайн або завантажити pdf Посібник з монтажу та експлуатації для Сантехнічний виріб Anzzi L-AZ901MB-BG. Anzzi L-AZ901MB-BG 8 сторінок. 2 tone lavatory faucet

INSTALLATION

1
2
HOT
PG.3
Faucet
[11]
[12]
[13]
[14]
COLD
STEP 1:
1.
Remove Rubber Gasket [12], Metal Gasket
[13] and Mounting Kit [14] from Faucet.
2.
Install Faucet with O-ring [11] at the bottom
into the faucet hole on sink. Adjust the Faucet.
3.
Slide Rubber Gasket [12], Metal Gasket [13]
up onto Faucet under sink and secure with
Mounting Kit [14].
4.
First hand tighten the Mounting Kit [14] then finish
tightening it with a screwdriver to secure the
Faucet.
STEP 2:
1.
Make sure all fittings and end connections are
free of debris.
2.
Turn off the supply valves (not provided).
Connect faucet supply hoses to the supply valves,
3.
making sure the red braided hose with "HOT"
label is connected to the hot supply valve and
the blue braided hose with "COLD" label is
connected to the cold supply valve. Hand tighten
the connections first, then finish tightening with
wrench. DO NOT OVERTIGHTEN.
WARNING: Do not use pipe dope or other
sealants on water connections.