Cascade 100C Інструкція з монтажу Посібник з монтажу - Сторінка 4

Переглянути онлайн або завантажити pdf Інструкція з монтажу Посібник з монтажу для Навантажувачі Cascade 100C. Cascade 100C 10 сторінок.

I
NSTALLATION
1
Attach overhead hoist
A
Remove banding.
B
Attach hoist to top of backrest as shown
and lift Attachment into vertical position
on pallet. Use wood blocking as required
to stabilize Attachment.
C
Remove bolt-on lower mounting hooks
(if equipped).
2
Unlock quick-change lower
mounting hooks (if equipped)
A
Remove pin and drop hooks into
unlocked position.
B
Reinstall pin in lower hole.
B
2
Bolt-on
C
Lower Hooks
Wood Blocking
A
Guide
e
®
a d
s c
c a
- 1
1 4
5 5
6 7
C -
LH lower
Hook
Pin
WARNING: Make sure overhead hoist
has a rated capacity of at least
2000 lbs. (910 kg.)
B
NOTE: Guides can be reversed to
reduce hook-to-carriage clearance
(See lower hook installation, Step 4).
5/8-in. (16 mm)
offset on top
provides max.
clearance.
Tighten Capscrews:
Class II, III Mounting – 165 ft.-lbs. (225 Nm)
Class IV Mounting – 190 ft.-lbs. (255 Nm)
FP0202.ill
CL0097.ill