Addie Water Systems TIG56SXT-S Посібник - Сторінка 5

Переглянути онлайн або завантажити pdf Посібник для Система водопостачання Addie Water Systems TIG56SXT-S. Addie Water Systems TIG56SXT-S 19 сторінок. Chemical free iron & sulfur reduction

SETTING THE CONTROL
The Iron Genie uses the Fleck
model SXT power head to manage
the regeneration process.
While in the "Service" position the
display will alternate between time of day and days remaining till regeneration.
The clock uses a standard 12 hour display.
The regeneration cycle is preset to occur at 12:30A.M. every second day. This
timing and frequency of regeneration can be modified as required.
The duration of the regeneration cycle is approximately 50 minutes.
1. Backwash cycle, 10 minute duration. Water flow is reversed inside
the unit to lift and reclassify the filter media rinsing accumulated
iron from the bed.
2. Oxygen refill, 40 minute duration. The unit empties of water and is
filled with air. During this cycle water will run to drain. There is a
slight delay at the start of the cycle while the pressure of the air
within the tank reaches atmospheric pressure. During this time no
air is drawn into the tank. Once the pressure has equalized, you
will hear as air is drawn into the unit.
3. The unit returns to the In-Service position. When this happens
water continues to enter the tank, compressing the air into a
bubble in the top portion of the tank. Air bubble volume will vary
slightly with the local conditions.
Untreated water is available during regeneration cycle.
Should you require the unit to regenerate at a time of day other than 12:30 A.M.
it is important that no other unit, softener or filter, regenerates at the same
time. This will interfere with the regeneration process of the Iron Genie.