CBE DS-300 Інструкція з експлуатації - Сторінка 7
Переглянути онлайн або завантажити pdf Інструкція з експлуатації для Панель керування CBE DS-300. CBE DS-300 13 сторінок.
1)
5A fuse to give power to the awning light, it depends on the main switch and it switches automatically
off when the engine is started.
2)
10A fuse to give power to the water pump, it depends on the main switch.
3)
10A fuse to give power to the heating/boiler, it depends on the lights main switch.
4)
20A fuse to give power to the lights group "A", it depends on the main switch.
5)
20A fuse to give power to the lights group "B", it depends on the main switch.
6)
30A fuse to give power to 12V AES or 3-way function fridge. The 3-way function fridge switches
automatically off when the engine is off.
7)
20A fuse for the auxiliary power supply (solar regulator), which is directly connected to the leisure
(B2) battery.
8)
25A fuse for the electrical step power supply, connected directly to the leisure (B2) battery.
9)
3A fuse for the gas power supply (fridge, kitchen, boiler valve, etc.), Connected directly to the leisure
(B2) battery.
10)
3A fuse for OUT D+ simulated exit protection.
11)
AES fridge connection; It is a bridge, which excludes the 3 way function fridge and is used to connect
the AES fridge directly to the B2.
12)
Simulated output D+ alternator to control the electrical step, AES refrigerator, electrical draining
valve, coming-back of the electrical antenna.
"DS-300" DISTRIBUTION BOX
2
4
5
10
20
B
A
10
20
1
3
5
14
1 2
13
17
8
1
16
16
9
1 2 3 4
19
6
8
10
20
3
AUX
30
25
7
9
15
11
18
-B2
+B2
20
21
14
3
12
+B1
22