Great Lakes GL480E-2432 Інструкція з монтажу Посібник з монтажу - Сторінка 8

Переглянути онлайн або завантажити pdf Інструкція з монтажу Посібник з монтажу для Корпус Great Lakes GL480E-2432. Great Lakes GL480E-2432 13 сторінок. Equipment cabinet/rack

Great Lakes GL480E-2432 Інструкція з монтажу Посібник з монтажу
TOP PANEL MOUNTING
The top panel of the cabinet is
installed at the manufacturer.
Removing the top panel can
be done by removing the four
#10-32 x 1" lg. Phillips pan head
screws. Then simply lift the top
panel out. There are five versions
of top panels (perforated is
shown). All top panels have two
cable access horseshoe
knockouts at one end.
TPE-24S
solid

BOTTOM PANELS

There are several styles of bottom panels available, solid is shown.
Styles must be ordered separately. All styles mount to all cabinets. The
bottom panels have a foam gasket to ensure a positive seal. The panels
mount to four internally threaded studs in the bottom of the cabinet
with four #10-32 x 1/2" lg. Phillips pan Head Screws.
See detail.
8
TPE-24P
TPE-24F
perferated
Three 75
CFM fans
Removable
top panel
Horseshoe
knockout
TPE-24F10
One 10"
CFM fan
#10-32 x 1" lg
Philips pan
head screw
Qty. 4
TPE-242F10
Two 10" 550
CFM fans
#10-32 x 1/2"
lg. Philips pan
head screw
Qty. 4
Bottom panel
BOTT OM PANEL
(Solid)
(SOLID)
#10-32 x 1/2" lg
PH ILLIPS P AN
H EAD SCR EW
Q TY - 4 PER
BOTT OM PANEL
(BLA CK )