CEITEC NANO DHR2-RHEOMETER Короткий посібник - Сторінка 2

Переглянути онлайн або завантажити pdf Короткий посібник для Вимірювальні прилади CEITEC NANO DHR2-RHEOMETER. CEITEC NANO DHR2-RHEOMETER 2 сторінки.

a. Ensure that both the upper and the lower geometry are installed and selected in the
TRIOS software as the active geometries.
b. Make sure that the geometries are clean.
c. Bring the rheometer head to close contact (approx. 5-20 mm) using the up/down
arrows on the front panel.
d. Go to Gap control panel – Click on the Zero gap icon
8. The instrument is ready for use.
1. Ensure that the instrument is initiated, calibrated (incl. geometry), and clean.
2. Load the sample.
3. Set the measuring procedure.
4. Run the experiment.
5. Once the measurement is finished, raise the head with the upper geometry and clean both
geometries.
Do not exceed the Axial force of +/– 10N and avoid excessive force on the
upper geometry!
Never use steel brushes or other hard tools for cleaning!
such as brass, copper, certain plastics, paper cloths, etc., are allowed for cleaning!
Never use corrosives or abrasives for cleaning!
1. Dismount the upper geometry.
a.
Make sure that the geometry is unlocked and free to
b. Raise the head, hold the upper geometry with one hand and gently unscrew the spindle
with the second hand. Always rotate the spindle - never turn with the geometry!
2. For using the optical stage lower geometry, reinstall the Peltier Plate using the smart swap.
a. Press the smart swap button on the front panel, and unplug the geometry connector
while the green light blinks.
b. Press the smart swap button on the front panel again, remove the geometry while the
green light is on.
c. Install the Peltier plate geometry following step 6 of the initialization procedure.
3. Turn off the SW TRIOS.
4. Turn off the Control unit and the water pump.
5. Install the Spindle lock.
6. Close the pressure air valve.
The order of steps 4-6 must not be interchanged! Never leave the spindle lock on when the
rheometer is running. The pressure air supply is always the first thing to be turned on and
the last thing to be turned off!
Version No. 1, Created/Updated: 20.1.2022 by Peter Lepcio, Ph.D., [email protected]
Approved: 24.1.2022 by Jiří Zita, Ph.D:
Avoid contact between the geometries!
Measuring
If necessary, dismount the upper geometry for cleaning.
Turning off
.
Only tools from soft materials
spin.