Automatic Technology EASYROLLER GDO-6AM Інструкція з монтажу - Сторінка 2
Переглянути онлайн або завантажити pdf Інструкція з монтажу для Аксесуари для фотоапаратів Automatic Technology EASYROLLER GDO-6AM. Automatic Technology EASYROLLER GDO-6AM 2 сторінки. Battery backup kit
8
9
6
SBC-02
1
Opener Mounted
Opener Mounted
a. Unplug the drive unit from mains power.
b. Remove the timing cover and light diffuser.
c. Mount the Charger Board
Taptite 'P' M4x8 screws
.
10
d. Feed the battery harness
secure left corner of the board. Feed the Wire Harness
the timing assembly, through opening and plug into SBC-02
connector on the control board.
e. Remove breakaway slot on timing cover and feed wire battery
harness
through slot and replace timing cover. Secure in place
9
with screws.
f. Mount battery backup kit
1
side screw first (charger board side)
g. Position the wire battery harness
battery kit with cable clamp
WARNING! After Step (h) the opener may become active
(even when power is off). This is a result of a residual charge
in the batteries.
AVERTISSEMENT! Après l'étape (b) l'opérateur peut
deviendra actif (même alimentation est éteinte). Ceci est un
résultat d'une charge résiduel dans les batteries.
h. Connect battery harnesses
i. Close the light diffuser and reconnect power.
NOTE: Batteries may take up to 48 hours to charge fully after initial
installation.
j. Run the Testing / Maintenance procedure to test battery.
Troubleshooting
Symptom
Door stops or moves very slowly
under battery power
Door will not operate when
mains power is disconnected.
7
9
12
10
8
7
11
8
on the chasis and secure with four (4)
7
through the cable clamp
5
8
onto support chassis and secure right
.
11
neatly and secure left side of
9
.
6
and
together.
5
9
Possible cause
Batteries may be weak or have no charge
Batteries may not be connected properly.
Batteries may have no charge
Faulty Batteries
9
5
SBC-02
Wall Mounted
3
(i) For plaster walls - insert (2) two plaster wall plugs
battery backup kit over holes and affix with (2) two Taptite "P" M3.5
x 8 screws
(ii) For brick walls - place the battery backup kit over the holes and affix
and
12
with (2) two Taptite "P" M3.5 x 8 screws
around
WARNING! After Step (i) the opener may become active (even
when power is off). This is a result of a residual charge in the
batteries.
AVERTISSEMENT! Après l'étape (i) l'opérateur peut deviendra
actif (même alimentation est éteinte). Ceci est un résultat d'une
charge résiduel dans les batteries.
i. Connect battery harness
j. Close the light diffuser and reconnect power.
NOTE: Batteries may take up to 24 hours to charge fully after initial
installation.
k. Run the Testing / Maintenance procedure to test battery.
Testing / Maintenance
To ensure a long trouble free life for your battery backup it is recommended
you run the testing procedure on a monthly basis. Batteries should not need
replacing for 4 - 5 years.
Testing Procedure:
a. Press the transmitter to activate the opener.
b. Whilst the door is in motion disconnect power. The door should
complete the cycle as normal.
c. Wait for the door to finish is travel.
d. Press the transmitter to activate the opener.
e. Whilst the door is in motion reconnect power. If the door stopped
or moved very slowly under battery power, ensure mains power is
connected for 24 hours to recharge the batteries. Test the opener again
under battery power to ensure batteries are working effectively.
Remedy
Connect mains power and allow the batteries to charge. This may
take 24 hours to reach maximum charge capacity.
Check wiring.
Connect mains power and allow the batteries to charge. This may
take 24 hours to reach maximum charge capacity.
Disconnect the batteries from the board. Check the voltage of the
each battery. Voltage should not drop below 10V.
Automatic Technology America
3626 North Hall Street, Suite 610, Dallas, TX 75219, United States of America
P: +1 800 934 9892 W: www.ata-america.com
Wall Mounted
a. Unplug the drive unit from mains power.
b. Remove the timing cover and light diffuser.
c. Mount the Charger Board
secure with four (4) Taptite 'P' M4x8 screws
d. Feed the battery harness
clamp
and secure left corner of the board.
12
Feed the Wire Harness
assembly, through opening and plug into
5
SBC-02 connector on the control board.
e. Remove breakaway slot on timing cover and
2
feed wire battery harness
replace timing cover. Secure in place with
screws.
f. Connect the battery harness extension
4
plug to the battery harness
g. Position the wire battery harness
and secure left side of battery kit with cable
clamp
.
6
1
h. To wall mount - use the battery pack as
template to mark where to drill holes. Pre-drill
holes.
.
3
to the harness extension
2
on the chasis and
7
.
10
through the cable
5
around the timing
8
through slot and
9
5
as shown.
9
neatly
9
into holes, place
4
.
3
.
5