Celexon battery screen V2.0 Professional Plus Інструкція з експлуатації Посібник з експлуатації - Сторінка 7
Переглянути онлайн або завантажити pdf Інструкція з експлуатації Посібник з експлуатації для Аксесуари для проектора Celexon battery screen V2.0 Professional Plus. Celexon battery screen V2.0 Professional Plus 12 сторінок.
Make sure that the holes are parallel
to the wall! Use suitable dowels and
screws for your substrate.
Caution:
Do
not
screws! If you notice cracks in the caps
they must be replaced! The screen
must not be used with cracked caps.
Please ensure that the metal plates are
also used for wall and ceiling mounting,
otherwise a safe installation cannot be
guaranteed).
MOUNTING ON THE WALL
Measure the distance between the
holes in the side caps (two per cap)
and transfer them to the wall.
Drill the holes at the markings with the
holes with the right diameter for the
mounting material and make sure that
the drill holes are absolutely level (Use
a spirit level!).
Use dowels and screws that are
suitable
for
surface. Screw the two upper screws
into the wall most of the way and hang
the screen from both sides into the
upper hole. Make sure that the screen is
installed straight and level. Tighten
the screws and then tighten the lower
screws on both sides of the screen.
overtighten
the
your
mounting
6