Autopot AQUAvalve5 1Pot Прості інструкції з догляду - Сторінка 2

Переглянути онлайн або завантажити pdf Прості інструкції з догляду для Газонна та садова техніка Autopot AQUAvalve5 1Pot. Autopot AQUAvalve5 1Pot 2 сторінки.

1Pot system contents
• 1x 47 L reservoir and lid
• 1x 9mm golf filter
• 1x 1Pot tray and lid
• 1x 9mm inline tap
• 1x 15 litre pot
• 1.5 metres of 9mm pipe
• 1x AQUAvalve5
• 1x marix disc
• 1x 9mm top hat grommet
• 1x root control disc
Reference: 9mm pipe - Outside ø 9mm/Inside ø 7mm
Suggested layout
47 L
Reservoir
Pot up your plants, water through, then allow your plants to establish in the pots for a period of 7 to 10
days before turning your system on. This will encourage a stronger and healthier root system.
Always raise your tank to a minimum of 150mm above the highest AQUAvalve and re-fill the tank when
there is approximately a 1/3 of the solution left - NEVER ALLOW THE TANK TO RUN EMPTY.
For best results, we recommend mineral fertilisers. Do not use organic fertilisers, as they have a tendency
to block small pipe work.
Clean all substrate from the bottom and sides of the pots before placing in each tray.
This will ensure your system is clean from the start.
Always use free draining substrates, for example: soil/perlite, coco/perlite, soil/clay pebbles,
coco/clay pebbles, rockwool/clay pebbles.
[email protected] I www.autopot.co.uk I +44 (0)1276 534894
Plan views
and options
Connect your 9mm pipe to the
relevant fitting dependant on system size
AQUAvalve5
9mm pipe
9mm top hat grommet
9mm inline tap
9mm golf filter
Advice
1Pot dimensions
1
Put black marix
disc in pot
3
Remove collar
Push 9mm pipe through
collar and attach to
AQUAvalve nozzle
Rescrew collar - DON'T
overturn... when you
feel it grip STOP
5
Position tray
so it is level
Insert root control
disc Gold face up
7
8
Push 9mm top hat grommet
Inside the tank push
into tank, then push 9mm
9mm filter into 9mm pipe
pipe through grommet
Using your front instruction sheet, repeat the module set up instructions for the number of trays.
Allow your plants to establish for 7-10 days before turning system on
Advice
If you require any guidance email - [email protected]
375mm
1Pot setup
instructions
47 L
Reservoir
300mm
2
Fill pot with medium
and pot up plants.
Water through pot
and allow to drain
outside the tray.
4
Connect AQUAvalve
so 'half moon' is on
T section in the tray
6
Cut 9mm/16mm pipe
to appropriate length
9
Place
pot
in
the
tray, make sure it is
CLEAN!
Place lid over valve
onto tray