Galvin Safe-Cell 50104C Інструкція з монтажу виробу - Сторінка 2
Переглянути онлайн або завантажити pdf Інструкція з монтажу виробу для Блок управління Galvin Safe-Cell 50104C. Galvin Safe-Cell 50104C 4 сторінки. Manual prison tapware
PRE-INSTALLATION -
−
If the mounting holes do not already exist, mark out
and drill the hole in the bench/trough to suit your
requirements.
Note: Before installation, all lines must be flushed.
We recommend that a line strainer be installed
prior to drinking taps to eliminate any foreign material.
Ezy-Grip
INSTALLATION
INSTALLATION COMPLIANCE: Galvin Specialised products must be installed in accordance with these
installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements.
Water and/or electrical supply conditions must also comply to the applicable national and/or state standards.
Failing to comply with these provisions shall void the product warranty and may affect the performance of the
product.
IMPORTANT: Whilst our product designs take into account a broad range of installation types and surfaces, it is
important that surfaces which fixtures are mounted to are flat and free from defect. This is especially important
when installing product ranges that have been designed for correctional and health facilities, where special
attention is required to minimise ligature points and areas for concealment of contraband. In addition to ensuring
the products are fitted securely and in accordance with the following instructions, consideration shall be given to
the use of non-pick mastics such as BASF Sonolastic "Ultra" to ensure a high quality and safe installation.
MOUNTING DETAILS
67
NOM
115
NOM
59
1/2" CU/BSP
Version 2, 13 June 2017, Page 2 of 4
DRILL
33mm
67
NOM
115
NOM
59
1/2" CU /BSP
Multi-Grip