Galvin Specialised Ezy-Drink TD45L Інструкція з монтажу виробу - Сторінка 3
Переглянути онлайн або завантажити pdf Інструкція з монтажу виробу для Сантехнічний виріб Galvin Specialised Ezy-Drink TD45L. Galvin Specialised Ezy-Drink TD45L 4 сторінки. Lever bubbler tapware
3. Testing
− Once the drinking tap has been installed and tested for leaks, the water height must be adjusted to suit
the available pressure.
− To adjust water flow
1. Remove the blanking screw
2. Adjust the water height by turning the regulator screw
3. Replace blanking screw
Note: The full range from minimum flow to maximum flow is only ¼ turn
TROUBLESHOOTING
PROBLEM
Inconsistent flow
Water is not flowing from tap
Continuous flow
Rate of flow inadequate
Button hard to press
BLANKING SCREW
CAUSE
Blocked top assembly
Water is turned off
Blocked flow restrictor
Top assembly loose or internally
obstructed or damaged
The flow regulator screw may
not be adjusted correctly
The mains pressure may be too
great
Version 2, 8 June 2017, Page 3 of 4
RECTIFICATION
Remove top assembly and clean
Turn on water
Remove restrictor and clean
Remove top assembly, clean with water
and re-grease spindle if required
Remove blanking screw and adjust flow
regulating screw as described
Reduce to below 500kPa (70PSI).
Regrease spindle if required