AFL IDEAA 144F Інструкція з монтажу Посібник з монтажу - Сторінка 12
Переглянути онлайн або завантажити pdf Інструкція з монтажу Посібник з монтажу для Корпус AFL IDEAA 144F. AFL IDEAA 144F 14 сторінок.
7. Route the remaining distribution fiber slack through the
fiber routing section of the IDC. (Figure 21)
8. Use local accepted practices to label the distribution
fiber connection in the appropriate space on the door
label, as applicable.
9. Repeat Steps 2 – 8 for each addition distribution fiber
needing to be connected.
Note: Unused fibers should remain in the fiber
storage cartridge until needed.
MDU DROP CABLE INSTALLATION - 4.8MM CABLE
The 144F IDC is capable of supporting up to (72) direct connections to the living unit through the use of a MDU drop cable
for applications in which the interconnect panel will be bypassed.
Caution: Fiber optic cable is susceptible to damage from excessive bending, pulling or crushing forces.
At every stage of the installation process ensure that the fibers are free from unintentional cuts, knick or
bends to avoid potential fiber damage.
1. Remove the two caps to expose the nuts on the MDU drop access plate, located in the lower left corner
of the cabinet.
2. Using a standard 216 style tool, or similar, remove the two nuts that secure the MDU drop access plate
to the cabinet body. (Figure 22)
3. Remove the MDU drop access plate. (Figure 23)
4. Use local accepted practices to remove the cable sheath.
INSTALLATION INSTRUCTIONS
12
IDEAA
Interior Distribution Cabinet
®
Distribution
Jumper
Figure 21
© 2016, AFL, all rights reserved. Revision C, 3.3.17
Specifications are subject to change without notice.