AireGard FS-150 Посібник користувача - Сторінка 6
Переглянути онлайн або завантажити pdf Посібник користувача для Вентилятор AireGard FS-150. AireGard FS-150 12 сторінок. Fresh air supply
INSPECTION DOOR SETTINGS CHECK
1. Perform regular checking, cleaning and replacement on
the filter net and double check on the inspection door
of the unit.
2. The opening of the inspection door shall remain as 650
x 450 mm in dimension to facilitate easy maintenance
works..
Detailed dimension of the hanger
INSTALLATION GUIDES
A. MAIN UNIT & DUCTING INSTALLATION
1. Installing the 3 piece Hanging Screw Fastener
Ensure that the ceiling structure and the hanging tools for the unit
is strong enough to sustain 5 times of the original given weight of
the unit.
The position of the 3 Hanging Screw Fastener are as indicated in
the diagram.
2. Installing the unit onto the Fastener
Securely install the Screw Fastener, layering loop and main screws
(optional by user, use only M8-M10 types).
3. Connect the Ducting
Tightly secure the ducting to the connecting inlet or outlet and seal
it with tapes.
The ducting leading towards the air outlet should be installed diag-
onally in a downward direction between 1/100 to 1/50 angle to
prevent rain water from sipping into the outlet's opening.
Apply an additional layer of heat insulating material on surfaces of
the ductings, connecting points as well as the hanging fastener to
prevent it from condensation.
Direction of installation - Inspection Door facing down
Ducting Angle
1/100 - 1/50
Main Screws
Layering Loop
Screw Fastener
Heat Insulating
Material
page 4