Jaga Clima Canal Hybrid H10 Інструкція з монтажу Посібник з монтажу - Сторінка 14
Переглянути онлайн або завантажити pdf Інструкція з монтажу Посібник з монтажу для Регулятор температури Jaga Clima Canal Hybrid H10. Jaga Clima Canal Hybrid H10 20 сторінок.
8.4. FINISHING THE INSTALLATION BEFORE LAYING THE FLOOR
20
Assemble the valve cover plate and cover the trench with the
protective cover and the foil.
This protective cover must remain on the unit during the
entire installation.
8.5. FINISHING THE INSTALATION AFTER LAYING THE FLOOR
22
Final adjustment: max. o.8cm for perfect alignment with the
finished floor.
14
21
With screed (concrete or cement), edge insulation will have to
be installed around the unit in order to protect it from the stress
caused by the heating and the cooling.
23
After placing the subfloor and the finished floor: remove the
protective cover and the foil, place the grille and then apply the
finishing touches