AFRISO DIM 20 Інструкція з експлуатації - Сторінка 18
Переглянути онлайн або завантажити pdf Інструкція з експлуатації для Вимірювальні прилади AFRISO DIM 20. AFRISO DIM 20 20 сторінок. Digital pressure gauge
Maintenance
8
Maintenance
8.1
Maintenance intervals
8.2
Maintenance activities
9
Troubleshooting
18
Table 3: Maintenance intervals
When
Battery condition appears
in the display.
As required.
Replacing the battery
1.
Remove the old battery and replace with a new battery (refer to
chapter 6.1, page 11).
2.
Batteries may not be disposed of together with unsorted house-
hold waste. Return empty batteries to a collection point or to
your dealer for environmentally compatible disposal.
The memorized instrument adjustments are retained during the bat-
tery changing process.
Repair work may only be carried out by qualified, specially trained
personnel.
Table 4: Troubleshooting
Problem
"ERROR" appears
in menu during
configuration.
Other malfunction. –
Activity
Change battery, see below.
Clean instrument with non-
aggressive cleaning solution.
Possible reason
At least one of the
adjusted values is
outside the permissi-
ble range.
Remedy
Check adjusted
values, refer to
page 14.
Return the device
to the manufacturer
(refer to chap-
ter 11, page 19).
DIM 20