ADF LINEA 100 Інструкція з монтажу Посібник з монтажу - Сторінка 6
Переглянути онлайн або завантажити pdf Інструкція з монтажу Посібник з монтажу для Внутрішній камін ADF LINEA 100. ADF LINEA 100 16 сторінок. Nmv inbuilt heater zero clearance box supplement instructions
ADF 1000 NMV LINEA ZERO CLEARANCE BOX ASSEMBLY INSTRUCTIONS
Ventilation for the Inbuilt Heater Space
Vent Roof opening as per
3.4.2.2 in AS2918:2018
• The cavity must be vented to allow air flow through the Zero Clearance Box, to
keep all components and construction cool, and circulate warm air back into
the room. If the cavity is capped, the vent must be below the cavity cap, and no
restrictions to air flow. The cap will prevent heat pooling on the ceiling.
• Gap around the flue casing and the combustible roof material is minimum
50mm. If there is no roof cavity space between the ceiling and roof, See 3.4.2.2
in AS2918:2018 for venting through roof and weather proofing. Examples
shown on page 7.
• Include top and bottom vents, Minimum area 400mm x 90mm open air space
vents. One at 120mm above the hearth, but below the ZCB, the second
minimum 200mm below the ceiling, but 2135mm above the floor.
1/1/21
Vent >120mm above
Hearth, and below
the top of the bench
6