LiFePO4 Battery System

3. INSTALLATION

3.1 Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You
should have received the following items inside of package.
NO
NAME
SPECIFICATION
1
Wall mount
Wall mount bracket
Grid activation communication wire
2
Communication line 1
( used with 6)
3
Communication line 2
Used for Communication among batteries
Used for communication between battery
4
Communication line 3
and host computer
5
Connector&Terminal
Connector&Terminal
Used for activating the pack when grid
6
Adapter
power recover
Mounting screw
7
Screw
Used for auto restart when PV comeback
8
PV Wake up line
in off-grid system
9
User manual
User manual
10
Guarantee card
Guarantee card
1 1
Cables
Used for battery parallel connection
PICTURE
1
2
3
5
6
8
7
10
9
1 1
04

3.2 Mounting the Unit

Consider the following points before selecting where to install:
• Do not mount the battery on flammable construction materials.
• The ambient temperature should be between 0°C and 45°C to ensure optimal operation.
• The recommended installation position is to be adhered to the wall vertically.
• Be sure to keep other objects and surfaces as shown in the right diagram to guarantee sufficient heat dissipation and
to have enough space for removing wires.
G
4
H
I

3.3 Connection for Parallel Mode

The WG battery support to be connected in parallel for expansion. If you need one more battery
bank work in parallel mode, connect the battery as shown in PIC 2
Step 1: The batteries are placed
as shown in Figure 1
LiFePO4 Battery System
C
WG48200
140
D
320
159
401
E
357
401
198
F
180
240
G
Step 2: The schematic diagram of the parallel
connection of two battery packs is shown in
Figure 2.
05
A
B
H
I