Airflow Uno hab Інсталяційний комплект - Сторінка 14

Переглянути онлайн або завантажити pdf Інсталяційний комплект для Система опалення Airflow Uno hab. Airflow Uno hab 16 сторінок. Cavity wall decentralised mechanical ventilation with heat recovery unit
Також для Airflow Uno hab: Посібник з монтажу та експлуатації (16 сторінок), Інструкція (2 сторінок), Посібник з технічного обслуговування (2 сторінок)

© Airflow - we reserve the right to make changes without prior notice
7.1
Wiring diagram SD-4
Operation with 8x Unohab units and 2x Unohab PSF (Power supply flush mounted) connected in parallel
Unohab: M1 - start cycle: supply
M7
3
Unohab PSF*
*For 8x Unohab units, 2x PSF
should be connected in
parallel (directly next to each
other or below each other).
Unohab PSF*
1,5 mm²,
max. 4 m
Unohab Controller
Operation with 4x Unohab units and 1x Unohab PSD (Power supply DIN-rail mounted) or
Operation with 8x Unohab units and 2 x Unohab PSD (Power supply DIN-rail mounted) connected in parallel
Unohab: M1 - start cycle: supply
M7
3
Unohab Cavity Wall Installation Kit
6 - GND
8 - + 12V
M5
M3
M1
10 - PWM Start Supply
11 - PWM Start Extract
3
3
3
6
Distributor
8
UP-Dose
+
230 V~
230 V~ /
12 V =
-
1)
UP-Dose
+
230 V~
230 V~ /
12 V =
-
2
UP-Dose
8 9 10 11
7
6
-
5
4
+
1 2
6 - GND
M5
M3
M1
8 - + 12V
10 - PWM Start Supply
11 - PWM Start Extract
3
3
3
6
Distributor
8
Unohab Controller
UP-Dose
7
8 9 10 11
6
-
5
4
+
1 2
2
+ + - -
1,5 mm², max. 30 m
L N
14
Installation and Operating Instructions
Unohab: M2 - start cycle: extract
M2
M4
M6
3
3
10 11
Recommended Cable J-Y (ST) Y 0.8 mm 2
-
-
Maximum distance between Unohab Controller
and Unohab motor: 30m
-
All motors connected to Distributor
Max. distance from Unohab Controller to
-
Distributor: 4m
Max. 4m from Distributor
Unohab: M2 - start cycle: extract
M2
M4
M6
3
3
10 11
Recommended Cable J-Y (ST) Y 0.8 mm 2
-
Maximum distance between Unohab Controller and Unohab motor:
-
30m
-
All motors connected to Distributor
-
Max. distance from Unohab Controller to Distributor: 4m
For 5-8x Unohab units, 2x PSD
+ + - -
should be connected in parallel
(side by side).
L N
230 V~
fig.23
M8
3
3
M8
3
3
SD-4