Airflow DUPLEX RS5 5500/2000 Посібник зі складання - Сторінка 9

Переглянути онлайн або завантажити pdf Посібник зі складання для Кондиціонери Airflow DUPLEX RS5 5500/2000. Airflow DUPLEX RS5 5500/2000 16 сторінок. Air-handling units

Slope both the longer and shorter side of the casing 3% towards the condensate drain K1 in the
compartment e2/ c2 (SUP/IDA)
Position of condensate drains, top view (floor plan)
4.4.

Connecting ductwork

Connect the HVAC duct following the design documentation. Make sure that the air exhausted at
i2 does not return back to the fresh air supply e1.
Air duct must be connected to both inlet ports in a way that a uniform air speed profile is achieved
in the whole cross-section of inlet ports.
A straight air duct being at least 1 m long must be firmly connected to extraction ports to achieve a
uniform air speed profile in the whole cross-section of extraction ports.
A duct being at least 2 m long must be always connected to fan outlets to prevent injury caused by
the fan's impeller. This duct must be connected in such a way that it can be dismantled only by using
tools.
4.5.

Connecting the condensate drain pipe

The unit is equipped by two condensate outlets; these are used depending on whether an integrated
cooler is installed.
Use of condensate drains, integrated
cooler is installed
Use of condensate drains, integrated
cooler is not installed
9