James May Engineering Ultra Tonic Інструкція з монтажу Посібник з монтажу - Сторінка 4

Переглянути онлайн або завантажити pdf Інструкція з монтажу Посібник з монтажу для Аксесуари для музичних інструментів James May Engineering Ultra Tonic. James May Engineering Ultra Tonic 8 сторінок. Pickup version 3 for steel string guitars

It is highly recommended to use gel superglue or StewMac 30 thick superglue, generously applied so
that the whole surface is covered. Press firmly and hold or clamp until the glue sets up which will
typically be in about 1 minute. A little squeeze-out is normal and indicates that enough glue was used.
Leave undisturbed for 15 minutes.
2. Install the feedback suppression sensor
The feedback suppression sensor should be located at the far end of the bass corner of the bridge plate,
as far back (toward the rear) as the plate will allow. With a little practice, you can do this by feel. A jig
probably won't be necessary. Or use the magnet technique. You can experiment with a top guide
magnet while checking the bottom location with a mirror.
The sensor can overhang the end of the plate by as much as 2mm and still be fine. If it does overhang,
make sure the overhang is on the side with the wire, as the crystal is offset underneath the potting.
4