ALIEN WELD XM250 Посібник користувача - Сторінка 11
Переглянути онлайн або завантажити pdf Посібник користувача для Зварювальна система ALIEN WELD XM250. ALIEN WELD XM250 18 сторінок.
4.5. Gas bottle installation
Connection of Shield Gas
Connect the CO
hose, which come from the wire feeder to the copper nozzle
2
of gas bottle. The gas supply system includes the gas bottle, the air regulator
and the gas hose, the heater cable should be inserted into the socket of
machine's back, and use the hose clamp to tighten it to prevent leaking or
air-in, so that the welding spot is protected.
Please note:
1)
Avoid the sunshine on the gas cylinder to eliminate the possible
explosion of gas cylinder due to the increasing pressure of gas
resulted from the heat.
2) Fixed connector avoid leakage of shielding gas affects the
performance of arc welding.
3) It is extremely forbidden to knock at gas cylinder or lay the cylinder
horizontally.
4) Ensure no person is up against the regulator, before the gas release or
shut the gas output.
5) The gas output volume meter should be installed vertically to ensure
the precisely measuring.
6) Before the installation of gas regulator, release and shut the gas for
several time in order to remove the possible dust on the sieve to avail
the gas output.
The welding material, process and gas selection are listed below:
Material
Carbon steel
Carbon steel
Stainless steel
Aluminum silicon
Aluminum
magnesium
Aluminum alloy
Note: Since the arc of MIG welding is much strong than that of MMA welding, please wear welding helmet and protective clothing
Process
Constant voltage
Pulse
Pulse
Pulse
Pulse
Cool pulse
Gas
100% CO2
80/20 mixed gas
98/2 mixed gas
100% pure argon
100% pure argon
100% pure argon
.
11