Fujitsu ABU24RULX Технічні характеристики - Сторінка 13

Переглянути онлайн або завантажити pdf Технічні характеристики для Кондиціонер Fujitsu ABU24RULX. Fujitsu ABU24RULX 30 сторінок. Floor console / under ceiling dual type
Також для Fujitsu ABU24RULX: Посібник (48 сторінок)

Fujitsu ABU24RULX Технічні характеристики
ERROR CONTENTS
(outdoor unit)
1. Make a TEST RUN in accordance with the in-
stallation instruction sheet for the indoor unit.
2. OUTDOOR UNIT LEDS
When a malfunction occurs in the outdoor unit, the LED on
the circuit board lights to indicate the error. Refer to the fol-
lowing table for the description of each error according to the
LED.
LED
Communication error
1 flash
(Indoor unit - Outdoor unit)
2 flash
Discharg pipe temperature sensor
3 flash
Outdoor heat exchanger temperature sensor
4 flash
Outdoor temperature sensor
7 flash
Compressor temperature sensor
8 flash
Heat sink temperature sensor
9 flash
Pressure switch abnormal
12 flash
IPM error
13 flash
Compressor rotor position cannot detect
14 flash
Compressor cannot operate
15 flash
Outdoor fan abnormal (upper fan)
16 flash
Outdoor fan abnormal (lower fan)
lighting
No error
2005.12.28
Error contents
SPECIAL INSTALLATION
SETTING
PUMP DOWN (Refrigerant collecting operation)
Perform the following procedures to collect the refrigerant
when moving the indoor unit or the outdoor unit.
1. When the product is stopped:
1
Press the PUMP DOWN switch on the outdoor unit.
(The LED on the outdoor unit circuit board lights.)
2
The pump down operation (cooling operation) be-
gins right away. After oparation starts, close the
three-way valve (liquid).
3
After 2 - 3 minutes, operation stops. Close the three-
way valve (gas) within one minute after operations
stops.
4
The LED will go out three minutes after it stops.Dis-
connect the power supply after confirming that the
LED has gone out.
2. When the product is operating:
1
Press the PUMP DOWN switch on the outdoor unit.
The LED on the outdoor unit circuit board lights, and
operation stops. At this point, recovery has not been
completed, so do not close the two- and three-way
valves.
2
The pump down operation (cooling operation) be-
gins after three minutes. Close the three-way valve
(liquid) after operation starts.
3
After 2 - 3 minutes, operation stops. Close the three-
way valve (gas) within one minute after operations
stops.
4
The LED will go out three minutes after it stops. Dis-
connect the power supply after confirming that the
LED has gone out.
*When the pump down operation is repeated, temporarily disconnect
the power supply after opening the closed valves (both liquid and gas).
Reconnect the power supply after 2 - 3 minutes and perform the pump
down operation.
*When the start of the operation after pump down operation has been
completed, temporarily disconnect the power supply after opening the
closed valves (both liquid and gas).
Reconnect the power supply after 2-3 minutes and be sure to perform
a test operation for cooling.
3-way valve
(Liquid)
3-way valve
(Gas)
12