A-Safe RackEye Посібник користувача - Сторінка 5
Переглянути онлайн або завантажити pdf Посібник користувача для Аксесуари A-Safe RackEye. A-Safe RackEye 13 сторінок.
5. RackEye
Alert Sequences & Meanings
ª
Red Flash
A red flashing
sequence from the
RackEye™ alerts
to potential damage
to the upright.
The upright that
this RackEye™ is
monitoring should
be inspected as
soon as possible.
Amber
Red Flash
An amber and red
flashing sequence
from the device
notifies that the
device has been
moved out of
alignment or moved
without authority.
08
6. Resetting the RackEye
Amber
Flash
An amber flashing
sequence from the
RackEye™ notifies
that the batteries
are low with around
2 weeks of normal
operation left.
The RackEye™
will continue to
monitor for potential
damage during this
7. Inspection Levels
period.
Green
8. Risk Classification
Flash
A green flash every
Red Risk -
30 seconds from
Very serious damage requiring
the RackEye™
immediate action. Immediate off load.
shows that the
device is working
normally and
monitoring 24/7 for
potential damage to
the racking upright
it is on.
For damage to frames in which
the damage limits 3mm, 5mm and
10mm are exceeded by a factor
greater than of two i.e. greater than
6mm, 10mm and 20mm.
ª
Firstly
Scan the
select
leg on
'Reset
which the
Device'
RackEye™
from the
is in alert
main menu.
state.
BEAM
BEAM
5mm or 3mm
MAX bend
3mm
5mm
in upright
section in one
metre gauge
length
Amber Risk -
Hazardous damage requiring action as
soon as possible. Off load within 4 weeks.
For damage to frames in which
the damage limits 3mm, 5mm and
10mm are exceeded by up to a
factor of two i.e. up to 6mm, 10mm
and 20mm.
An inspection
report is
created
summarising
all info
entered.
10mm
10mm max bend in
bracing section in
one metre gauge
length or pro rata
for shorter bracing
memebers about
10mm
either axis
10mm
Green Risk -
Damage requiring surveillance.
For damage to frames in which
the damage limits 3mm, 5mm and
10mm are not exceeded.
www.asafe.com
09