Install Door Assembly
1- Secure heat access panel to electric heat vestibule,
blower deck and base of unit. Use existing screws.
See figure 8.
2- Install hinges on electric heat door.
3- Install knob on electric heat door.
4- Install spring latch to door frame with #8 screws
(provided).
5- Secure electric heat door hinges onto door frame.
Make sure door opens to the right. Make sure door
opens and closes properly; adjust hinges if
necessary.
Blower Speed Requirements
Electric heater applications require specific supply air
blower volumes. Refer to blower tables in the unit
installation instruction for start-up.
Unit Start-Up (Heating Cycle)
Set room thermostat for proper heat or auto operation if
switching subbase is used. Close disconnect switch and
position heat setpoint lever above room temperature.
Refer to unit installation instructions for additional
information on start-up operations and adjustments.
Heating Operation
Cooling Units:
Single Stage (7.5, 15kW)
A W1 thermostat demand will energize the first stage of
electric heat.
Two Stage (22.5, 30, 45, 60kW)
A W1 thermostat demand will energize both stages of
electric heat.
Heat Pump Units:
A W1 thermostat demand will energize both compressors
in heating mode (reversing valves are not energized). A
W2 thermostat demand will energize the first stage of
electric heat in addition to compressors operating in heat
pump mode.
INSTALL DOOR ASSEMBLY
LATCH
FIGURE 8
Page 8
HEAT ACCESS
PANEL
DOOR