Aqua Quip APL 511N Посібник з монтажу та експлуатації - Сторінка 4
Переглянути онлайн або завантажити pdf Посібник з монтажу та експлуатації для Трансформатор Aqua Quip APL 511N. Aqua Quip APL 511N 6 сторінок. Led transformer 12 volt 30va
2
DUAL
OUTLET
1 Find a suitable location for the mounting of the Transformer. It should be mounted undercover and at
least 500mm off the ground.
2 Use the Template provided on this sheet to drill mounting screw holes at 93mm apart. Screws and wall
plugs are provided. Mount the transformer onto the mounting screws. See Diagram D.
3 To connect the light cables: first remove 20mm of outer cable sheath and then bare back the two
sheathed conductors to expose 8mm of tinned copper. See Diagram A.
4 Locate the Connectors, which are supplied in a plastic bag. Affix each of the cables to the connectors
and tighten screws, see Diagram B.
Align and push the connectors into the receptacles on the underside of the transformer, See Diagram C.
5 Plug transformer into a 240v power point, turn pool lights on to test for a maximum of 10 seconds.
Then leave pool lights off until fully submerged.
Diagram A
Cables
2
P L U G - I N
INSTALLATION INSTRUCTIONS
Diagram B
Connectors
20mm
8mm
Automatic Pool Cleaners (Australia) Pty Ltd
40 Percy Street, Auburn NSW 2144
Ph: 02 9643 8338 Fax: 02 9643 8448
www.aquaquip.com.au
T R A N S F O R M E R
TRANSFORMER
Tighten screws
Diagram D
Mounting
Mounting Holes Template
COPYRIGHT AUTOMATIC POOL CLEANERS (AUSTRALIA) PTY LTD
–
I N S T A L L A T I O N
I N S T R U C T I O N S
Diagram C
Underside of transformer
93mm
&
O W N E R S
12 VOLT
60VA
TAPL5122p_1116
M A N U A L