DGS Retail P2310 Посібник - Сторінка 4
Переглянути онлайн або завантажити pdf Посібник для Монітор DGS Retail P2310. DGS Retail P2310 9 сторінок. Orchard bin bulk display kit
Install 1 Side Panel with Legs (A) to the open
4
side of the assembly from previous steps. Line
up the holes in the metal legs to the holes in the
2 Side Panels no legs (B) and use 4 long Screws
With the help of a second person,
6
flip the bin upward so that it is
resting on the Levelors. Using a
screw driver, check that all 16
screws (4 per side) are tight.
Drop the Top Shelf
9
(C) into position and
secure with 4 long
screws.
www.dgsretail.com
ORCHARD BIN BULK FOOD DISPLAY
7
Drop into place the
10
Black Liner (E) to
the top of the Bin.
Install 1 Handle to each of
11
the 2 sides of the Bin using 5
screws (included). Line up
the holes of the handle with
the pilot holes provided. Do
not Over Tighten. These are
Decorative Handles Only.
©DGS Retail, Inc. All drawings are property of DGS Retail, Inc.
and cannot be used without express written consent.
assembly instructions
5
Use 4 long
8
screws (1 in
each corner)
to secure the
Bottom Shelf
in place.
Insert Center Divider (D) into the cleats and slide
12
it all the way into the bin.
Assemby
Complete
5513 N. Cumberland Ave. Chicago IL 60656
CUSTOMER SERVICE: 1-800-211-9646
Install 4 Levelors to the threaded inserts in the
metal legs.
Insert Center Divider (D) into the cleats and slide
it all the way into the bin.