Dell EMC N3200-ON Series Посібник з монтажу - Сторінка 6
Переглянути онлайн або завантажити pdf Посібник з монтажу для Перемикач Dell EMC N3200-ON Series. Dell EMC N3200-ON Series 10 сторінок. Powerswitch; external power supply installation
Також для Dell EMC N3200-ON Series: Посібник з монтажу (10 сторінок)
Front mount
5-inch offset mount
Rear mount
4. Screw the single-switch L-bracket to the two-post rack using two M4 screws (length 6.8 mm) for each bracket.
Torque the screws to 10 inch-lbs.
To remove the switch from the two-post rack, remove the four screws from the two-post rack and slide the switch from the
rack.
MPS-3S two-post installation
This installation procedure is for the three-slot EPS shelf. Use mounting brackets for front, 5-inch offset, or rear-mount two-
post installation.
These mounting supplies ship with the MPS-3S.
1. Locate the mounting brackets and screws that ship with the EPS.
2. Insert the mounting brackets onto the mushroom head on each side of the EPS and slide the mounting bracket back to lock
it into place.
● For front-mount: The mounting bracket and bracket ears face the front of the EPS.
● For five-inch-offset mount: The mounting bracket is at the front of the EPS with the bracket ears facing the back of the
EPS.
● For rear-mount: The mounting bracket and bracket ears face the back of the EPS.
3. Attach the mounting brackets to the switch using four screws for each bracket.
Torque the screws to 10 inch-lbs.
6
N-Series EPS installation