Dell S6010-ON Посібник з монтажу - Сторінка 19

Переглянути онлайн або завантажити pdf Посібник з монтажу для Перемикач Dell S6010-ON. Dell S6010-ON 46 сторінок.
Також для Dell S6010-ON: Примітки до випуску прошивки (12 сторінок)

Dell S6010-ON Посібник з монтажу
Figure 9. Assembly to S6010–ON PSU-side
1
1–Pan head screws
CAUTION:
Take care not to damage the attached ground wire as you proceed to install the switch.
After you install the switch in the rack, see

Install the Dell ReadyRails System

The ReadyRails rack mounting system is provided to easily configure your rack so that you can install your switch.
The Dell ReadyRails™ system is provided for 1U front-rack and two-post installations. The ReadyRails system includes two separately
packaged rail assemblies and two rails that are shipped attached to the sides of the switch. Install the ReadyRails system using the 1U tool-
less method or one of three possible 1U tooled methods (two-post flush mount, two-post center mount, or four-post threaded).
CAUTION:
Your system is not NEBS Earthquake Z4-compliant if you use the 1U tool-less square-hole or two-post installation
methods.
CAUTION:
Do not use the mounted ReadyRails as a shelf or a workplace.
NOTE:
The illustrations in this document are not intended to represent a specific switch.

1U tool-less configuration

CAUTION:
Do not use this method if you need your system to be NEBS Earthquake Z4-compliant.
1
With the ReadyRails flange ears facing outward, place one rail between the left and right vertical posts.
Completing the Ground Wire
2
2–L-bracket
Installation.
S6010–ON installation
19