Miele PW 811 План інсталяції - Сторінка 15
Переглянути онлайн або завантажити pdf План інсталяції для Пральна машина Miele PW 811. Miele PW 811 38 сторінок.
PW 811 / PW 814 / PW 818
Dispenser pump connections
Up to 12 dispenser pumps can be connected to the washing
machine.
It is particularly important to observe manufacturer's instructions
when using a combination of cleaning agents and special
application products.
Dispenser pump connections on the back of the machine
Connections 1 and 2 are provided for viscous agents. These
connections are sealed and need to be drilled open using an 8 mm
drill bit before connecting.
Make sure that you only drill through the first panel (I) as there is a
deflecting panel (II) 10 mm behind it.
Connections 3 to 12 are provided for liquid detergent. These
connections are sealed and must be cut to the diameter of the hose
with a small saw.
If opened connections are no longer required, they must be resealed
using a suitable sealant (e.g. silicone).
Installation and planning notes
15