Miele PWM 920 DD План інсталяції - Сторінка 9

Переглянути онлайн або завантажити pdf План інсталяції для Пральна машина Miele PWM 920 DD. Miele PWM 920 DD 34 сторінки. Commercial washing machine

Miele PWM 920 DD План інсталяції
Dispenser pump connections on the back of the machine
Connections 1 and 2 are provided for viscous agents and can also be
used for high-pressure dispensing systems with water injection. The
dispensing systems must be fitted with a separate drinking water
safety feature in accordance with EN 61770 and EN 1717. The maxi-
mum flow rate is 1500 ml/min with a maximum flow pressure 43 psi
(300 kPa).
These connectors are sealed and need to be drilled open using an
8 mm drill bit before connecting.
Care must be taken to drill through the first wall only (I) as there is a
deflecting panel (II) 3/8" (10 mm) behind it.
Connections 3 to 12 are provided for liquid detergent. High-pressure
dispensing systems with water injection must not be connected to
these connections. These connectors are sealed and must be cut to
the diameter of the hose with a small saw prior to being made.
If opened connectors are no longer required, they must be resealed
using a suitable sealant (e.g., silicone).
Connection terminals for five time-controlled dispenser pumps, which
can be operated without a multifunction module, are located behind
the cover adjacent to the electrical connection.
Calibration of the dispenser pumps and regulation of dispensing
quantities is carried out semi-automatically for washing machines
fitted with an optional multifunction module. Information regarding
settings is given in the operating instructions.
en - Installation and planning notes
9