Burlington R8 CHR Інструкція з монтажу Посібник з монтажу - Сторінка 4
Переглянути онлайн або завантажити pdf Інструкція з монтажу Посібник з монтажу для Система опалення Burlington R8 CHR. Burlington R8 CHR 7 сторінок. Summer electric heating kit
Також для Burlington R8 CHR: Посібник із швидкого старту (2 сторінок)
Heated with the summer electric heating kit only
Parts required:
The diagram of the summer electric heating kit as shown above is for reference only, and
can be purchased separately.
4
Connect to the electric supply via a fused spur. Then
6
check for leaks. At all times follow the installation
instructions supplied with the Summer Electric Heating
kit. All electric work must be done by a suitably qualified
person.
1x
If the radiator is to be used for electric heating only ( not
5
connected to a central heating system ), then seal the
bottom inlet / outlet nipples with the blanking plugs.
Fill the radiator approximately 90% with a water mixture
containing a rust inhibitor – failure to do this will lead to
leaking as the radiator rusts from the inside. Filling with
more than 90% liquid will lead to leaking as the water
mixture expands as it heats up.
After installation ...
● Use a screwdriver to open the air vent, heating
the liquid inside radiator till summer heating kit
stop working, once no liquid flowing out from the
air vent, use a screwdriver to close the air vent,
then the radiator is ready for use!
4 - 5
Fill water
Water mixture volume (90% full ) :
R1 CHR : 6.5 liters
R2 CHR : 4.5 liters
E