Ricoh Pro C900s Посібник з монтажу - Сторінка 13

Переглянути онлайн або завантажити pdf Посібник з монтажу для Принтер Ricoh Pro C900s. Ricoh Pro C900s 24 сторінки. Color server options
Також для Ricoh Pro C900s: Технічні характеристики (6 сторінок), Посібник з експлуатації (27 сторінок), Брошура та технічні характеристики (8 сторінок), Примітки для користувачів (2 сторінок), Додаток для користувача (24 сторінок), Посібник з техніки безпеки (12 сторінок)

Ricoh Pro C900s Посібник з монтажу

Stage 1: Workshop Run-Up Procedure

Important:
Do not include the Perfect Binder in the run-up procedure.
All Pro C900/ Pro C900s models require a basic run-up procedure in the
workshop prior to moving the machine to the customer's site.
It is recommended to allow two days for one technician to complete the
workshop run-up procedure. This should allow sufficient time to ensure
the machine performance prior to the on-site installation.
The following items need be completed in the listed order.
Please always refer to the Pro C900/ Pro C900s and Peripheral Service
Manuals for full details:
1. Remove the mainframe from the pallet and remove all external
2. Install the 32 amp plug: Before installing the 32 amp plug to the
3. Level the mainframe: This is only required if the workshop floor is
4. Remove the internal packaging and tape
5. Install silicon oil into the fusing unit.
Important:
Do not fill the oil tank with silicon oil. This will be performed
at the customer's site. The mainframe is shipped with enough
silicon oil in the oil tank to complete the basic run-up
procedure.
6. Install the toner bottles
7. Install the operation panel unit
8. The following steps should be performed at the same time while
9. Connecting cables: Connect the Fiery controller to the Gigabit
10. Connect the LCT-MF (large capacity tray) (for Pro C900s only)
11. Test the breaker switch
12. Plug the power cord into the power source and turn the machine
Colour High Volume Production System - Installation Guide
Pro C900
tape and packaging material from mainframe
mainframe, ensure that the style of plug meets the customer's site
requirements—that is, straight or angled style.
very uneven.
the ear controller ox is open:
a. Install the optional counter interface type A if required.
b. Tray Heaters: If the Pro C900 or Pro C900s is to be
installed in a high humidity / high temperature (HH)
environment, connect the Tray Heaters. It is recommended
to connect the tray heaters connector to CN606 if mainly
coated paper stocks are to be used.
c. Oil Pump Connector: Measure the workshop 32 amp wall
socket. If the input voltage is 235 volts or above, install the
oil supply connector to CN617. If the input voltage is below
235 volts, install the oil supply connector to CN616. The
default position for the oil supply connector is CN616.
Please repeat this procedure at the customer's site.
Ethernet slot.
on.
Page 13 of 24