Gas Hookup and Information
—————————————————————————————————
A. Fuel
Before making gas connections, ensure the appliance
being installed is compatible with the available gas type.
B. Gas Pressure
Proper input pressures are required for optimum perfor-
mance. Gas line sizing requirements need to be made
Fire Risk
Explosion Risk
Verify inlet pressures.
• High pressure may cause overfire condi-
tion.
• Low pressure may cause explosion.
• Verify minimum pressures when other
household gas appliances are operating
Install regulator upstream of valve if line
pressure is greater than ½ psig.
Pressure requirements for appliance are shown in ta-
ble below. Minimum pressures must be met when oth-
er household gas appliances are operating.
Pressure
Minimum Inlet Pressure
Maximum Inlet Pressure
The appliance and its individual shutoff valve must be
disconnected from the gas supply piping system during
any pressures in excess of 1/2 psi (3.5 kPa).
The appliance must be isolated from the gas supply
piping system by closing its individual manual shutoff
valve during any pressure testing of the gas supply pip-
ing system at test pressures equal to or less than 1/2
psi (3.5 kPa).
Note: Have the gas supply installed in accordance with
local building codes, if any. If not, follow ANSI 223.1.
Installation should be done by a qualified installer ap-
proved and/or licensed as required by the locality. (In the
Commonwealth of Massachusetts installation must be
performed by a licensed plumber or gas fitter.
10
!
WARNING
Natural Gas
7 in w.c.
10.5 in w.c.
Note: A listed (and Commonwealth of Massachusetts
approved) 3/8 in. T-handle manual shut-off valve and
flexible gas connector are connected to the 3/8 in.
control valve inlet.
If substituting for these components, please consult
local codes for compliance.
Incoming gas line should be piped to the ½ inch con-
nection on the manual shutoff valve.
• A small amount of air will be in the gas supply lines.
When first lighting appliance it will take a short time for
air to purge from lines. Subsequent lighting of the unit
Propane
will not require such purging. Never allow the ON/
11 in. w.c.
OFF valve to remain in the open position without
pressing and continuing to hold igniter button
14 in. w.c.
FIRST.
Fittings and connections may have loosened during
shipping and handling
!
WARNING
Fire Risk
Explosion Risk
• Gas build-up during line purge may ig-
nite.
• Purge should be performed by qualified
technician.
• Ensure adequate ventilation.
• Ensure there are no ignition sources
such as sparks or open flames.
!
WARNING
CHECK FOR GAS LEAKS
Fire Risk
Explosion Risk
Asphyxiation Risk
• Check all fittings and connections.
• Do not use open flame.
• After the gas line installation is com-
plete, all connections must be tightened
and checked for leaks with a commercial-
ly available leak-check solution. Be sure
to rinse off all leak check solution. Be
sure to rinse off all leak check solution
following testing.